Sarrazac photovoltaic park (46)

The project

The Sarrazac project was initiated by five local landowners, in close collaboration with the municipality led by Mayor Habib Fenni. With a capacity of 11.5 MWp, the installation is designed to supply electricity to approximately 15,000 people. Located in a natural area, the Sarrazac installation is part of an approach aimed at enhancing natural spaces and supporting the energy transition while promoting local development.

After five years of administrative procedures and preparation, the project entered its construction phase in 2013, four years after the building permit application was submitted in 2009. Construction work began on September 2, 2013, and the photovoltaic power plant was commissioned in 2014.